Methodology for Accelerated Bridge Construction (ABC)
BridgInnova always focus on opportunities with challenging situations for heavy lifting and carrying on bridge construction
- Need innovative solutions to overcome troubles
. Geography (water, mountains)
. Congestion (difficult to continuously move crane, traffic safety)
- Utilize Accelerated Bridge Construction (ABC) methodology
. philosophy to be innovative and not bound by traditional methods.
Special Hanging Lifter working in Canada
Passing through tunnel to erect beam
BridgInnova has substantial intellectual property and patents protection on ABC methodology including 4 patents in USA
Patents in USA